Perencanaan Penjadwalan Preventive Maintenance Pada Mesin Heat Treatment DJ11 di PT Kangar Consolidated Industries

Natun, Danial Christian Paru (2019) Perencanaan Penjadwalan Preventive Maintenance Pada Mesin Heat Treatment DJ11 di PT Kangar Consolidated Industries. S1 thesis, Universitas Kristen Indonesia.

[img] Text (Hal_Judul_Abstrak_Daftar_Isi_Daftar_Tabel_Daftar_Gambar)
HalJudulAbstrakDaftarIsiDaftarTabelDaftarGambar.pdf

Download (946kB)
[img] Text (BAB_I)
BABI.pdf

Download (204kB)
[img] Text (BAB_II)
BABII.pdf
Restricted to Registered users only

Download (742kB)
[img] Text (BAB_III)
BABIII.pdf
Restricted to Registered users only

Download (204kB)
[img] Text (BAB_IV)
BABIV.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB_V)
BABV.pdf
Restricted to Registered users only

Download (388kB)
[img] Text (Daftar_Pustaka)
DaftarPustaka.pdf

Download (201kB)

Abstract

di mesin heat treatment PT KANGAR CONSOLIDATED INDUSTRIES terkadang terdapat breakdown komponen mesin yang mengakibatkan produk gagal. Komponen yang mengalami breakdown yang bisa menyebabkan produk gagal adalah: nozzle zona 1 utara, nozzle zona 1 selatan, busi zona 1 utara, busi zona 1 selatan, dan v belt zona 1. Terdapat 5 zona di mesin heat treatment, hanya zona 1 lah yang jika breakdown maka akan menyebabkan produk gagal, bentuk perawatan yang terdapat pada mesin heat treatment ini adalah breakdown maintenance yang membuat banyak menghasilkan produk gagal. Setiap melakukan kegiatan perawatan, kecepatan produksi akan dikurangi dan produksi pun berkurang, hal ini dilakukan untuk mencegah produk gagal saat perawatan berlangsung. Maka dari itu penjadwalan preventive maintenance diperhitungkan supaya bisa meminimalisasi kerugian saat perawatan berlangsung dan lebih menguntungkan daripada kegiatan breakdown maintenance In the PT KANGAR CONSOLIDATED INDUSTRIES heat treatment machine sometimes there is a breakdown of engine components which results in the product failing. Breakdown components that can cause failed products are: zone 1 north nozzle, south zone 1 nozzle, northern zone 1 spark plug, south zone 1 spark plug, and zone 1 v belt. There are 5 zones in the heat treatment machine, only zone 1 is the one if the breakdown will cause the product to fail, the form of treatment contained in this heat treatment machine is a breakdown maintenance that makes many produce a failed product. Every time doing maintenance activities, the production speed will be reduced and production will decrease, this is done to prevent the product from failing during maintenance. Therefore preventive maintenance scheduling is calculated so that it can minimize losses during maintenance and is more profitable than maintenance breakdown activities

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorYuda, Sesmaro MaxNIDN323036703UNSPECIFIED
UNSPECIFIEDTurnip, KimarUNSPECIFIEDUNSPECIFIED
Subjects: TECHNOLOGY > Mechanical engineering and machinery
Divisions: FAKULTAS TEKNIK > Teknik Mesin
Depositing User: Mr Alexander Jeremia
Date Deposited: 24 Mar 2021 08:08
Last Modified: 24 Mar 2021 08:08
URI: http://repository.uki.ac.id/id/eprint/4103

Actions (login required)

View Item View Item