SIMANGUNSONG, ANTONIUS (2026) EVALUASI EFEKTIVITAS MITIGASI TERHADAP IMPLEMENTASI PMS DAN IS-LIMITER DALAM MENGELIMINASI POTENSI BLACKOUT PADA SISTEM CAPTIVE POWER HYBRID: STUDI KASUS PT. FAJAR PAPER, Tbk. S2 thesis, Universitas Kristen Indonesia.
|
Text (Hal_Judul_Daftar_Isi_Daftar_Tabel_Daftar_Gambar_Daftar_Lampiran_Abstrak)
HalJudulDaftarisiDaftarTabelDaftarGambarDaftarLampiranAbstrak.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (1MB) |
|
|
Text (BAB_I)
BABI.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (1MB) |
|
|
Text (BAB_II)
BABII.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (949kB) |
|
|
Text (BAB_III)
BABIII.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (1MB) |
|
|
Text (BAB_IV)
BABIV.pdf Restricted to Registered users only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (3MB) |
|
|
Text (BAB_V)
BABV.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (657kB) |
|
|
Text (Daftar_Pustaka)
DaftarPustaka.pdf Available under License Creative Commons Attribution Non-commercial Share Alike. Download (792kB) |
|
|
Text (LAMPIRAN)
Lampiran.pdf Restricted to Repository staff only Available under License Creative Commons Attribution Non-commercial Share Alike. Download (6MB) |
Abstract
Sistem kelistrikan di bidang industrial dengan konfigurasi Hybrid Captive Power sering menghadapi kendala stabilitas berupa terjadinya pemadaman total (blackout) akibat terjadinya gangguan hubung singkat yang berasal dari internal pembangkitan maupun terjadinya gangguan Voltage dip yang sering datang dari sumber eksternal. PT. Fajar Paper, Tbk merupakan salah satu industri yang mengalami fenomena tersebut meskipun telah menerapkan sistem mitigasi pemantauan dan perangkat proteksi yang kemampuan respon terhadap signal cukup baik dibandingkan perangkat terdahulu. Penelitian ini bertujuan untuk mengkaji karakteristik kestabilan sistem serta mengevaluasi efektivitas strategi mitigasi yang digunakan saat ini seperti menggunakan Power Management System (PMS) dan perangkat Is-Limiter dalam upaya dapat mengeliminasi kondisi potensi terjadinya blackout yang berulang. Metodologi penelitian yang digunakan adalah pendekatan kuantitatif melalui pemodelan sistem jaringan existing. Data primer dan sekunder mencakup spesifikasi tiga unit generator (GT1, GT2, GT3), parameter perangkat pada jaringan 150 kV, serta data historis gangguan (disturbance record). Alat analisis utama yang digunakan adalah perangkat lunak ETAP untuk mensimulasikan kondisi load flow, short circuit, dan transient stability dengan melakukan simulasi 9 skenario operasi. Hasil penelitian menunjukkan bahwa implementasi Is-Limiter secara signifikan dapat mereduksi arus gangguan puncak dari 30 kA menjadi turun direntang 12 kA – 15 kA, Rentang penurunan nilai arus hubung singkat tersebut selama dalam satu siklus waktu akan menghasilkan besarnya energi gangguan (I2 x t) yang nilai prosentasi dapat mencapai lebih dari 70%. Pada aspek kestabilan transien, penggunaan kombinasi PMS dan Is-Limiter berhasil memperbaiki profil tegangan dari di bawah 0,6 pu menjadi di atas 0,8 pu, serta meredam deviasi frekuensi dari -1,2 Hz menjadi ±0,4 Hz. Algoritma program fast load shedding pada Power Management System (PMS) terbukti responsif dengan waktu reaksi kurang dari 80 ms setelah arus gangguan hubung singkat terdeteksi. Berdasarkan hasil penelitian, integrasi PMS dan Is-Limiter secara efektif mampu mengeliminasi potensi total blackout dan menjaga sinkronisasi unit pembangkitan pada sistem hybrid captive power. Sinergi antara pembatasan arus pada fase sub-transien oleh Is-Limiter dan manajemen beban adaptif oleh PMS merupakan strategi paling optimal untuk menjamin kontinuitas operasional industri. Kata Kunci: Blackout, Hybrid Captive Power, Is-Limiter, Power Management System, ETAP. / Industrial electrical systems with hybrid captive power configurations often face stability constraints in the form of total blackouts due to came from internal short-circuit interference or came from external voltage dips. PT. Fajar Paper, Tbk is one of the industries that experiences this phenomenon even though it has implemented a monitoring and protection system. This study aims to examine the characteristics of system stability and evaluate the effectiveness of mitigation strategies using Power Management System (PMS) and Is-Limiter devices in eliminating potential blackouts. The research methodology used is a quantitative approach through modeling of existing network systems. Primary and secondary data include the specifications of three generator units (GT1, GT2, GT3), device parameters on the 150 kV network, and disturbance record data. The main analysis tool used is ETAP software to simulate load flow, short circuit, and transient stability conditions by simulating 9 operating scenarios. The results of the study show that the implementation of Is-Limiter can significantly reduce the peak interference current from 30 kA to a decrease in the range of 12 kA – 15 kA, The range of decreasing the value of the short-circuit current during one time cycle will result in a large amount of interference energy (I2 x t) whose percentage value can reach more than 70%. In terms of transient stability, the use of a combination of PMS and Is-Limiter successfully improved the voltage profile from below 0.6 pu to above 0.8 pu, as well as reduced the frequency deviation from -1.2 Hz to ±0.4 Hz. The fast load shedding program algorithm on the Power Management System (PMS) proved to be responsive with a reaction time of less than 80 ms after a short-circuit interference current was detected. Based on the results of the study, the integration of PMS and Is-Limiter was able to effectively eliminate the potential for total blackout and maintain the synchronization of the generation unit in the hybrid captive power system. The synergy between current limiting in the sub-transient phase by Is-Limiter and adaptive load management by PMS is the most optimal strategy to ensure the continuity of industrial operations. Keywords: Blackout, Hybrid Captive Power, is-Limiter, Power Management System, ETAP.
| Item Type: | Thesis (S2) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||||||
| Subjects: | TECHNOLOGY TECHNOLOGY > Technology (General) > Industrial engineering. Management engineering TECHNOLOGY > Engineering (General). Civil engineering (General) TECHNOLOGY > Engineering (General). Civil engineering (General) > Management of engineering works |
||||||||||||
| Divisions: | PROGRAM PASCASARJANA > Magister Teknik Elektro | ||||||||||||
| Depositing User: | Mr Antonius Simangunsong | ||||||||||||
| Date Deposited: | 09 Nov 2026 06:44 | ||||||||||||
| Last Modified: | 09 Nov 2026 06:44 | ||||||||||||
| URI: | http://repository.uki.ac.id/id/eprint/24165 |
Actions (login required)
![]() |
View Item |
