Nempung, Judo Ignatius and Silalahi, Eva Magdalena and Sihite, Edward Baringin and Stepanus, Stepanus (2023) Tinjauan Pembangkit Listrik Tenaga Bayu sebagai Sumber Daya Utama Menggantikan PLN dan Genset terhadap Energy Security pada Infrastruktur di Pulau Terpencil/Terluar. Jurnal Pendidikan dan Konseling, 5 (2). pp. 2339-2348. ISSN 2685 936X
Text
TinjauanPembangkitListrikTenagaBayu.pdf Download (445kB) |
Abstract
Listrik memiliki peran penting sebagai sumber daya infrastruktur telekomunikasi selular (BTS) dalam menjamin kontinuitas penyediaan telekomunikasi antar pelanggan karena bisa berdampak pada kerugian baik bagi pihak operator maupun pelanggan. Listrik dari PLN yang setiap harinya shutdown selama 2 jam menjadi masalah penting dan harus dicarikan alternatif konfigurasi hybrid sumber daya listriknya. Sumber daya existing dirasa masih kurang dari segi ketahanan energi BTS system. Namun sumber listrik juga memiliki peran penting dan strategis dalam pembangunan berkelanjutan dengan memperhatikan aspek sosial, ekonomi dan lingkungan. Hal tersebut dapat dilihat dalam peraturan pemerintah No. 79 Tahun 2014 tentang kebijakan Energi Nasional (KEN). Alternatif konfigurasi pengganti disajikan untuk mencari konfigurasi lebih baik dengan mengutamakan penggunaan energi terbarukan seperti PLTB. 3 elemen dan dimensi 4A digunakan untuk menentukan alternatif terbaik disamping alternatif usulan utama yang menggunakan PLTB sebagai sumber daya utama. Aspek ekonomi dan lingkungan akan diperlihatkan juga untuk mengetahui perbedaan semua alternatif termasuk yang existing. Kalkulasi menggunakan persamaan HHI untuk mencari indeks tunggal power sharing sumber daya listrik dan persamaan normalisasi untuk mencari nilai min –max indikator relatif setiap konfigurasi. Bobot masing-masing indikator relatif dibuat rata atau berbobot sama karena tidak ada penekanan pada indikator tertentu. Hasil dengan ketahanan energi terbaik dapat dilihat pada angka energy security index terbesar yang diperlihatkan pada tabel. Kata kunci : BTS, PLN shutdown, konfigurasi alternatif, PLTB, indikator elemen, indikator relative, Energy Security Index (ESI)/ lectricity has very important things as a cellular telecommunications infrastructure (BTS) resource in ensuring the continuity of telecommunications provision between customers because it can have an impact on losses for both operators and customers. Electricity from PLN, which is shut down for 2 hours, is an important problem every day and must find alternative hybrid configurations for its electricity resources. Existing resources are still considered insufficient in terms of BTS system energy security. However, electricity sources also have an important and strategic role in sustainable development by paying attention to social, economic and environmental aspects. This can be seen in government regulation No. 79 of 2014 concerning the National Energy policy (KEN). The alternative replacement configurations are presented to find the best configuration by prioritizing the use of renewable energy such as PLTB. 3 elements and dimensions of 4A are used to determine the best alternative in addition to the main proposed alternative that uses PLTB as the main power supply. Economic and environmental aspects will also be shown to find out the differences in all alternatives including existing ones. The calculation uses the HHI equation to find the single index of power sharing power sources and the normalization equation to find the relative min –max value of the indicator of each configuration. The weight of each indicator is relatively made flat or equally weighted because there is no emphasis on a particular indicator. The results with the best energy security can be seen in the largest energy security index figures shown in the radar tables and graphs. Keywords : BTS, PLN shutdown, alternative configuration, PLTB, element indicators, relative indicators, Energy Security Index (ESI)
Item Type: | Article |
---|---|
Subjects: | TECHNOLOGY > Electrical engineering. Electronics. Nuclear engineering |
Depositing User: | Ms Mentari Simanjuntak |
Date Deposited: | 16 May 2023 09:08 |
Last Modified: | 16 May 2023 09:08 |
URI: | http://repository.uki.ac.id/id/eprint/11247 |
Actions (login required)
View Item |